Here’s a video link to a behind-the-scenes look at the progress made on the new structure that spans the Mississippi River near downtown Minneapolis one year after the I-35W bridge collapse that happened Aug. 1, 2007.
http://www.minnpost.com/videos/35wbridge2/
The new bridge is scheduled to open in mid to late September – a full three months ahead of schedule.
-end-
Leave a Reply